330,826 research outputs found

    Gold Coast Quarry project Terms of reference for the

    Get PDF
    Government supports and encourages the dissemination and exchange of information. However, copyright protects this publication. The State of Queensland has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright and this material remains unaltered. Copyright inquiries about this publication should be directed to [email protected] or i

    Challenges and opportunities to develop a smart city: A case study of Gold Coast, Australia

    Get PDF
    With the rapid growth of information and communication technologies, there is a growing interest in developing smart cities with a focus on the knowledge economy, use of sensors and mobile technologies to plan and manage cities. The proponents argue that these emerging technologies have potential application in efficiently managing the environment and infrastructure, promoting economic development and actively engaging the public, thus contributing to building safe, healthy, sustainable and resilient cities. However, are there other important elements in addition to technologies which can contribute to the creation of smart cities? What are some of the challenges and opportunities for developing a smart city? This paper aims to answer these questions by developing a conceptual framework for smart cities. The framework is then applied to the city of Gold Coast to identify challenges and opportunities for developing the city into a ‘smart city’. Gold Coast is a popular tourist city of about 600,000 populations in South East Queensland, Australia, at the southern end of the 240km long coastal conurbation that is centred by Brisbane. Recently, IBM has nominated Gold Coast as one of the three cities in Australia for its Smarter Cities Challenge Grant. The grant will provide the Gold Coast City Council with the opportunity to collaborate with a group of experts from IBM to develop strategies for enhancing its ICT arrangements for disaster response capabilities. Gold Coast, meanwhile, has potential to diversify its economy from being centred on tourism to a knowledge economy with focus on its educational institutions, investments in cultural precincts and high quality lifestyle amenities. These provide a unique opportunity for building Gold Coast as an important smart city in the region. As part of the research methodology, the paper will review relevant policies of the council. Finally, lessons will be drawn from the case study for other cities which seek to establish themselves as smart cities

    Beyond the Beach and into the Blue: Gold Coast High-rises and the Oceanic Gaze

    Get PDF
    Gold Coast high-rises are big and tall and sometimes they appear or are made to appear bigger and taller than they really are. They also loom large in other ways. They are part of the fabric and fantasy of the Gold Coast. They are its supreme icons. Only nine per cent of the permanent population lives in high-rises and the canal estates have considerable local cachet and appeal. Yet the city turns to its high-rises not only to promote itself to the rest of the world, but also to hold its own self-image: the Gold Coast City Council sponsors a ‘heritage’ architectural guide to tall buildings on the Gold Coast; the Gold Coast Bulletin constantly features articles on new high-rise plans and developments, high-rise architects, builders and developers, and high-rise residents. No-one seems to complain about views being obscured, at least publicly, and the shadows-on-the-beach argument, once a talking point, has been abandoned—in resignation, perhaps

    ITS implementation plan for the Gold Coast area

    Get PDF
    ITS needs to be used to reinforce the planned major changes to the road functional hierarchy in the District, namely: • the use of Southport-Burleigh Rd. (SBR) as the major regional corridor; • the removal of through traffic from the GCH; • the use of Oxley Dr./Olsen Av./Ross St./NBR as another major north-south by-pass; • the use of Smith St.; NSR/Queen St.; NBR and Reedy Creek Rd. – West Burleigh Road as the major east-west access corridors. There is a need to integrate the proposed ITS measures into the current related plans for the Pacific Motorway and into the overall traffic control strategies for the area as a whole. In addition, the staging of the proposed plan needs to take into account the planned DMR capital Works Program. An index representing the degree of priority to be attached to each network link was developed to assist in the phased implementation of ITS technologies over the next 5 years. 'ITS Index' is made up of five variables, namely: • Accident rate factor • AADT • Volume/Capacity ratio • Delay • % Commercial Vehicles The main components of the ITS plan are shown diagrammatically in Figure 1. The latter assumes that the high level of ITS implementation on the Pacific Motorway will be extended in time to the remainder of that Highway. To assist in the implementation of the road hierarchy system, a new static signage plan should be implemented. This plan needs to reinforce the changes by clearly assigning single road names to corridors and by placing new signs at appropriate locations. Capturing Traffic Data The following corridors should be equipped with automatic traffic monitoring capability in priority order: High Priority ? SBR corridor from Smith St. connection to Reedy Creek Rd. ? Smith St. from Pacific Highway to High St. ? GCH from Pacific Highway to North St. Medium Priority ? Nerang-Broadbeach Rd/Ross St. to Nerang-Southport Rd. ? Nerang-Southport Rd from Pacific Highway to SBR ? Nerang-Broadbeach Rd from Pacific Highway to SBR The Smith St. link from the Pacific Motorway to Olsen Ave. should be considered as a freeway for monitoring purposes. The GCH along the coastal strip needs to be treated as a local distributor rather than as the major corridor. As a result, the future traffic surveillance priority should be low. At least one permanent environmental (vehicle emissions) monitoring station should be set up as part of the ITS plan. The most appropriate site for such a station would seem to be on the SBR corridor at the vicinity of Hooker Blv. intersection. Pacific Highway The Pacific Motorway project will set the benchmark for freeway incident detection and traffic management in the State. The high level of ITS implementation on the Motorway section will create a significant gap in performance and expectation, relative to the remainder of the Highway. It is recommended that the southern sections of the Pacific Highway be equipped to the equivalent level of traffic data collection and surveillance as the newly upgraded Motorway section, under a staged program. Travel Time Savings The travel time benefits of the full implementation of ITS over the network are likely to be of the order of at least 5 percent of vehicle-hours travelled on the affected links. At a discount rate of 6 percent, the total present value of the gross travel time benefit over 10 years is of the order of $200 million

    Decision support systems optimising effluent release in sub tropical estuarine environment - An Australian case study

    Get PDF
    Gold Coast Water is responsible for the management of the water and wastewater assets of the City of the Gold Coast on Australia’s east coast. Treated wastewater is released at the Gold Coast Seaway on an outgoing tide in order for the plume to be dispersed before the tide changes and renters the Broadwater estuary. Rapid population growth over the past decade has placed increasing demands on the receiving waters for the release of the City’s effluent. The Seaway SmartRelease Project is designed to optimise the release of the effluent from the City’s main wastewater treatment plant in order to minimise the impact of the estuarine water quality and maximise the cost efficiency of pumping. In order to do this an optimisation study that involves water quality monitoring, numerical modelling and a web based decision support system was conducted. An intensive monitoring campaign provided information on water levels, currents, winds, waves, nutrients and bacterial levels within the Broadwater. These data were then used to calibrate and verify numerical models using the MIKE by DHI suite of software. The decision support system then collects continually measured data such as water levels, interacts with the WWTP SCADA system, runs the models in forecast mode and provides the optimal time window to release the required amount of effluent from the WWTP. The City’s increasing population means that the length of time available for releasing the water with minimal impact may be exceeded within 5 years. Optimising the release of the treated water through monitoring, modelling and a decision support system has been an effective way of demonstrating the limited environmental impact of the expected short term increase in effluent disposal procedures. (PDF contains 5 pages

    Chicago\u27s Street of Streets

    Get PDF
    Michigan Avenue is a sophisticated young lady who strolls from Roosevelt Road up toward the Gold Coast with one shoulder lowered. Across this shoulder thee sees the green beauty of the park and the masts and sails of white yachts on the blue lake

    Gold Coast Thesis

    Get PDF

    An indexing model for stormwater quality assessment: stormwater management in the Gold Coast

    Get PDF
    In the age of climate change and rapid urbanisation, stormwater management and water sensitive urban design have become important issues for urban policy makers. This paper reports the initial findings of a research study that develops an indexing model for assessing stormwater quality in the Gold Coast
    • …
    corecore